How it works
Four steps, from scoping call to sign-off
Our AI platform runs your migration in four steps, and ITSM experts review each one before it moves on. You check 100 of your own records before you commit, and every record is counted at the end.
Scope my migrationFree sample migration of 100 of your records, plus a flexible quote within 24 hours.
01Scope
We map every field with you
A scoping call with an ITSM specialist surfaces volumes, timelines and risk early. Then we map fields, entities and relationships between your source and destination, including custom fields and platform-specific features. Nothing moves until you approve the mapping.
MigrateX does
- Run the scoping call and confirm record counts
- Map fields, relationships and custom fields
- List everything that moves, and everything that doesn't
Your team does
- Share access to the source platform (API token or OAuth)
- Review the mapping and flag anything that looks off
- Approve the scope before a single record moves

- Field mapping
- Scope: objects, date ranges, exclusions
- Timeline with dates and checkpoints
02Free sample
Check 100 of your own records first
We move 100 records you choose into your new platform, with their notes and attachments. Your team reviews them in the destination itself, not in a report. If something needs adjusting, we fix it. Then you get a flexible quote within 24 hours.
MigrateX does
- Move your 100 chosen records with notes and attachments
- Fix anything your team flags
- Send a flexible quote within 24 hours
Your team does
- Pick the records that matter most to you
- Check them in the new platform
- Give the go-ahead for the full run

- Your 100 records in the destination
- Sample report
- Flexible quote within 24 hours
03Migrate
The rest moves, with a final sync at cutover
Our engineers run the full migration in a window you choose and watch it the whole time. Your team keeps working in the old platform. At cutover we sync the last changes, so the switch happens in one planned window, with a rollback plan ready.
MigrateX does
- Run the full migration in the agreed window
- Monitor the run and handle exceptions as they appear
- Sync the last changes at cutover
Your team does
- Keep working in the old platform
- Pause automations and notifications during the production run
- Confirm the cutover window

| Object | Moved | Source |
|---|---|---|
| Organisations | 27 | 27 |
| Contacts | 4,879 | 4,888 |
| Tickets | 5,726 | 5,732 |
| Changes | 22 | 22 |
| Request items | 9,206 | 9,301 |
| Source records | 19,970 |
ServiceNow to Freshservice. Client name withheld. Exceptions were re-run before sign-off.
04Reconcile
Every record counted, every exception closed
A reconciliation report counts every record from source to destination. Anything that did not fit is fixed and shown to you before sign-off. You keep the full handover package for audits and for the team that runs the new platform.
MigrateX does
- Count every record from source to destination
- Fix and log every exception
- Hand over the mapping, ID references and logs
Your team does
- Review the reconciliation report
- Check the exception log
- Sign off

- Reconciliation report
- Exception log
- Sign-off
Handover
What you keep when we are done
A clear audit trail for your compliance team and a reference for the people who run the new platform.
- 1000+
- migrations
- 15 years
- of collective experience
Final field mapping
Every source field and where it landed, with the rules applied.
Record ID references
Source ID to destination ID for every record that moved.
Reconciliation report
Counts per object, source against destination.
Exception log
What did not fit, what we did about it, and when.
Common questions
Still unsure? Ask us on the scoping call.
How long does a migration take?
It depends on volume and route. You get a timeline with dates and checkpoints on the scoping call, before anything starts. For reference, one ServiceNow to Freshservice run moved 19,970 source records in 136 minutes, and a 28,000+ ticket healthcare project took 5 weeks from kickoff to handover.
What happens if something goes wrong during cutover?
Every production cutover is monitored and has a rollback plan. If something needs attention, we pause, find the cause, and either fix it in place or roll back to the pre-migration state. You get status updates throughout.
Do we need to shut down our systems?
No. Your team keeps working in the old platform during the main run. We ask you to pause automations and notifications only during the production run, then sync the last changes at cutover.
What if our data structures don't match?
That is what scoping is for. We map fields, entities and relationships between source and destination with your team. Custom fields and platform-specific features are agreed before any data moves.
Can we migrate only some of our data?
Yes. During scoping we agree exactly what is included and excluded: record types, date ranges or segments. The free sample lets you check the selection before the full run.
What do we receive after the migration?
The final field mapping, source to destination record ID references, the reconciliation report, the exception log and the migration logs.

Start with 100 of your records.
Scope my migrationFree sample migration of 100 of your records, plus a flexible quote within 24 hours.